Why the metre mark drifts, and where the error comes from

Length accuracy8 min readPublished 27 Nov 2026Sources: field measurement, drive theory
The short answer

The metre mark is not drifting because the printer is inaccurate. It drifts because three independent errors are added together: encoder resolution and wheel wear (systematic, proportional to length), capstan slip (random, driven by tension and material), and print delay compensation (a fixed offset that changes with speed). Only the first is a printer problem. The other two are line problems that the printer is asked to solve.

This matters because the fix is different for each. Replacing the printer fixes one of the three, and buyers frequently replace a machine to solve an encoder problem.

Three error sources

SourceHow it behavesHow to detect it
Encoder / measuring wheelSystematic. Error grows with distance at a constant rate. A worn wheel under-reads because its effective circumference shrinks.Compare a measured 100 m against the counter at two different speeds. If the error is the same percentage at both, it is here.
Capstan slipRandom and load-dependent. Appears with tension changes, acceleration, and slippery compounds. Error is not proportional to length — it clusters.Measure ten consecutive 100 m runs. If the spread is wide but the average is close, it is slip.
Print delayA constant time offset between trigger and droplet landing. Converts to a distance that scales with speed.Compare low speed against high speed. If the error changes with speed, it is delay.

The diagnostic value of this table is in the third column. Three measurements — two speeds, ten repeats — separate three causes, and each has a different owner.

Why it becomes metres

A tolerance quoted per metre is not what the customer measures. On a drum, error accumulates in proportion to length, so a small percentage becomes a large absolute number:

DriftOn 100 mOn 500 mOn 1,000 m
0.5%0.5 m2.5 m5 m
1%1 m5 m10 m
2%2 m10 m20 m

At 2% on a full drum, 20 metres of copper are invoiced as if they were there. Whether that is a rounding error or a commercial dispute depends entirely on the customer, not on the number.

Accumulated length error on a 1000 metre drum at 0.5, 1 and 2 percent drift
Figure 1. Error accumulates with length, so the number that matters is the one measured at the end of the drum — not the one quoted per metre.

Why speed changes the error

Print delay is a time, and time becomes distance as soon as the line moves.

At 100 m/min
1.67 m/s — a 1 ms delay is 1.7 mm
At 400 m/min
6.67 m/s — a 1 ms delay is 6.7 mm
At 800 m/min
13.3 m/s — a 1 ms delay is 13.3 mm
At 1,200 m/min
20 m/s — a 1 ms delay is 20 mm

This is why calibrating at low speed and running at high speed produces a mark that is accurate on the sample and wrong on the drum. The compensation has to be applied per speed, or the trigger has to come from an encoder that already knows how fast the line is moving.

The one question that exposes the design

"If I change line speed by 30% without telling the printer, does the metre spacing change?" If the answer is yes, the system uses a timer or a fixed delay. If no, it is closed-loop on an encoder. Only the second is usable on a line with variable speed.

Measuring it in half an hour

You need a tape measure, a marker and two speeds. No laboratory.

1

Mark a start point on the cable and on the floor

Run until the counter shows a round number — 100 m is enough. Mark the cable and the floor at the same instant, or photograph both.

2

Measure the actual length

Tape measure along the run, or measure the drum circumference and count turns. Record it against the counter, in millimetres.

3

Repeat at the highest speed you will run

Same 100 m, same material. The difference between the two results is the speed-dependent part — that is delay, not encoder.

4

Repeat three times at one speed

The spread is slip. If one run is 30 mm off and the next is 5 mm off, no calibration will fix it — check tension and the measuring wheel contact.

Half an hour of this produces a diagnosis that a week of arguing with a vendor will not. It also produces the numbers you need for the contract clause below.

Writing it into the contract

A length tolerance without a method is unenforceable, because both sides can measure in good faith and disagree. Specify four things:

The wording that works: "length error shall not exceed ±0.3% over any 100 m at line speeds from 50 to 800 m/min, measured by tape against the printed counter on production material." Every part of that sentence is testable, and none of it requires a specification argument.

Questions we get

Is the error usually the encoder or the printer?

In our reading of line reports, the encoder and its wheel are the more common cause on older lines, and print delay compensation on lines that change speed. The printer is rarely at fault for a systematic percentage error — that points upstream.

Can I calibrate it myself?

Yes, with a tape measure and two speeds. What you cannot do yourself is change the compensation curve if the system does not expose it — that is a service function, and worth asking about before purchase.

What tolerance is normal on a cable line?

Tolerances around ±0.3% to ±0.5% over 100 m are commonly asked for on lines where length is invoiced. What matters more than the number is that it is stated with a method, and that it is measured at the speed you actually run.

Does the metre mark need to be sequential, or can it be printed per length?

It must be sequential and continuous — that is the whole point. This means the printer needs an encoder signal, not a trigger from the line's start. Any system triggered by a timer will drift the moment the line speeds up.

What if the customer measures a whole drum and we measure in 100 m sections?

Then agree which one governs, in writing. Sectional measurement and whole-drum measurement produce different numbers because slip and delay errors accumulate differently. Most disputes are about the method, not the tolerance.

Related

Also in cable and pipe

Four pages that connect to this one.

Cluster index
Coding on cable and pipe

The full production guide, including where length accuracy sits among the constraints.

Index
Coding at 800 m/min

Why the trigger, not the ink, becomes the limit.

Speed
What the mark must carry

The metre mark is the only field a customer measures.

Regulatory
Acceptance testing

Where the metre mark check belongs in FAT and SAT.

Contract